Integral mechanisation for the construction of hydraulic tunnels
Integral mechanisation for the construction of hydraulic tunnels
Client: East-West Transfer. Water resources
Location: Caribbean
Sector: Infrastructure
Typology: Civil works
Scope: First integral mechanisation for the construction of tunnels with the supply of the most modern drilling, loading, bolting and transport equipment, which has meant a total change from the previous technology based on traditional systems.
Supply, launch, training and maintenance of: Hydraulic drills and bolting rigs for underground works. Both in advancement and support of tunnels.
Loaders and low-profile trucks for hauling material into the tunnels.
Ventilation stations and ducts to ventilate the work fronts.
Innovative umbrella systems using Symmetrix and Swellex technology.
RELATED PRODUCTS